Bridge & Civil Structures commercial concrete contractors

Service profile

Bridge & Civil Structures

TxDOT-spec bridge decks, abutments, and retaining systems for civil infrastructure packages.

Mobilization
5-7 days
QA reporting
Daily field logs
Packages delivered
400+
Crew coverage
Irving & Metroplex
Self-performed
Core scope crews
Average variance
<1% schedule

About Bridge & Civil Structures

Bridge decks, abutments, culverts, and other civil concrete structures form the infrastructure backbone connecting communities and supporting development across North Texas. These projects demand compliance with TxDOT specifications, traffic control expertise, and the quality systems that ensure decades of service under challenging conditions.

As your general contractor for civil infrastructure concrete, we execute bridge rehabilitation, new structure construction, and the specialized concrete work that municipal and transportation projects require. Our crews understand TxDOT specifications, are experienced with traffic control requirements, and maintain the documentation systems public projects demand.

The DFW Metroplex's ongoing growth creates continuous infrastructure needs—new road construction, bridge widenings, and utility corridor improvements. These projects often involve night work, weekend closures, and intensive schedule demands to minimize public impacts while maintaining quality and safety standards.

Civil concrete work requires specialized capabilities beyond typical commercial construction—dowel bar drilling, bridge deck finishing, traffic barrier installation, and coordination with utility relocations and traffic management. Our civil infrastructure experience includes successful project delivery for municipal clients and developers across the region.

What's Included

  • Bridge deck removal and replacement
  • Abutment and pier construction
  • Box culvert installation
  • Traffic barrier and rail systems
  • Bridge approach slabs
  • Drainage structure construction
  • Traffic control coordination
  • TxDOT documentation and testing

What this scope delivers

As your general contractor, we engineer, schedule, and execute bridge & civil structures packages across Irving, TXfor commercial and industrial projects. Property owners and developers get direct accountability, transparent pricing, and professional project management.

Design-assist alignment

We plug into preconstruction early, reviewing drawings for embed coordination, lift plans, and pour sequencing so bridge & civil structures aligns with the broader build.

Crewed for Metroplex speed

Dedicated bridge concrete crews staged across the Metroplex shorten mobilization windows and keep manpower consistent through multi-phase scopes.

Transparent field reporting

Daily civil structures updates, photo logs, and testing summaries document every milestone for owner reps and construction managers.

QA/QC baked into pours

Laser layout, third-party testing, and post-pour walks confirm infrastructure concrete requirements before downstream trades mobilize.

Commercial & Industrial Applications

Typical applications

Request a bid →
Bridge deck rehabilitationNew bridge constructionRoadway widening projectsBox culvert replacementsTraffic barrier upgradesMunicipal infrastructure improvements

Execution framework

How we keep the scope on schedule

  1. 01

    Scope coordination

    We align drawings, RFIs, and finish standards with your team to confirm sequencing, logistics, and tolerances before bridge & civil structures mobilizes.

  2. 02

    Site logistics & safety

    Detailed logistics maps, crane placement, and safety planning keep crews productive and compliant throughout bridge & civil structures execution in Irving.

  3. 03

    Field execution

    Self-performed crews manage layout, formwork, placement, and finishing with superintendent oversight and real-time reporting.

  4. 04

    Close-out & turnover

    Punch walks, testing reports, and as-built documentation verify performance before handing off to downstream trades.

Quality and safety controls

  • Certified crews & audits

    Weekly safety stand-downs, JHAs, and third-party inspections keep our bridge & civil structures teams compliant on every Irving, TX jobsite.

  • Testing & documentation

    We coordinate break tests, flatness readings, and special inspections with labs to maintain traceable records for owners and bridge concretes.

  • Communication rhythm

    Look-ahead schedules, coordination huddles, and daily reports ensure no surprises for the GC or owner reps.

Need project-specific QA/QC documentation, submittals, or safety plans? We assemble packages tailored to your owner and AHJ requirements before mobilization.

Measured outcomes

Results owners notice

Every bridge & civil structures package is tracked against schedule, QA benchmarks, and owner punch lists so you can move to the next trade with confidence.

Schedule reliability
99% milestones met

Tracked through weekly look-aheads and daily updates to keep bridge & civil structures scopes synced with other trades in Irving.

Owner punch items
<2 per project

Proactive walk-throughs and photo documentation keep finish quality tight and cut rework.

Testing compliance
100% logs filed

Cylinder breaks, floor flatness, and inspection reports uploaded within 24 hours of each pour.

Crew retention
5+ year leads

Experienced foremen guide every bridge & civil structures phase, protecting craftsmanship and safety culture.

Frequently asked questions

Bridge & Civil Structures in Irving, TX

Common questions from developers and property owners planning bridge & civil structures projects across North Texas.

Do you work on TxDOT projects?

Yes, we execute concrete work meeting TxDOT specifications for bridge decks, barriers, and roadway elements. Our quality control systems, testing protocols, and documentation meet TxDOT requirements.

Can you handle night and weekend work schedules?

Civil infrastructure projects often require night or weekend work to minimize traffic impacts. We schedule crews, coordinate with traffic control companies, and execute complete scopes during limited closure windows.

What about traffic control and public safety?

We coordinate with certified traffic control companies, maintain OSHA-compliant work zones, and implement safety protocols that protect workers and the traveling public during all civil infrastructure work.

How do you manage concrete placement during bridge deck pours?

Bridge deck pours require detailed planning for concrete supply, pumping or deck placement equipment, finishing operations, and curing. We develop pour plans coordinated with ready-mix suppliers to ensure continuous placement and quality results.

Ready when you are

Get a direct bid for your bridge & civil structures project

Developers and property owners: share your plans and we'll provide a complete project proposal with transparent pricing and single-source accountability as your general contractor.

Let’s pour

Ready to start your next commercial concrete project?

Call NowBridge & Civil Structures | Concrete Contractors of Irving | Concrete Contractors of Irving