
Service profile
Parking Garage Construction
Cast-in-place and precast hybrid parking structures with elevated decks, ramps, and integrated waterproofing systems.
- Mobilization
- 5-7 days
- QA reporting
- Daily field logs
- Packages delivered
- 400+
- Crew coverage
- Irving & Metroplex
- Self-performed
- Core scope crews
- Average variance
- <1% schedule
About Parking Garage Construction
Parking garage construction combines structural complexity with demanding durability requirements. These structures must support heavy vehicle loads, resist chloride intrusion from road salts, and maintain serviceability for decades. As your general contractor, we deliver parking structures that meet these demands.
The DFW market has seen significant parking garage construction driven by urban infill development, healthcare expansion, and mixed-use projects. From Las Colinas corporate garages to medical center parking structures, each project requires careful attention to structural design, waterproofing systems, and long-term maintenance planning.
Parking garage construction involves multiple concrete trades—foundations, columns, beams, elevated decks, and ramps—all requiring different forming systems, reinforcement patterns, and finishing requirements. Our crews manage these transitions seamlessly, maintaining schedule while delivering the quality that facility owners expect.
We work with developers and property owners on both cast-in-place and precast hybrid parking structures. The right approach depends on your site constraints, schedule requirements, and budget parameters. Our preconstruction team helps evaluate options and develop project-specific solutions.
What's Included
- Foundation systems and below-grade construction
- Structural columns, beams, and shear walls
- Elevated deck construction and ramps
- Post-tensioning for deck systems
- Waterproofing membrane installation
- Expansion joint systems
- Traffic coating and striping
- MEP coordination and installation
What this scope delivers
As your general contractor, we engineer, schedule, and execute parking garage construction packages across Irving, TXfor commercial and industrial projects. Property owners and developers get direct accountability, transparent pricing, and professional project management.
Design-assist alignment
We plug into preconstruction early, reviewing drawings for embed coordination, lift plans, and pour sequencing so parking garage construction aligns with the broader build.
Crewed for Metroplex speed
Dedicated parking garage contractors crews staged across the Metroplex shorten mobilization windows and keep manpower consistent through multi-phase scopes.
Transparent field reporting
Daily elevated parking decks updates, photo logs, and testing summaries document every milestone for owner reps and construction managers.
QA/QC baked into pours
Laser layout, third-party testing, and post-pour walks confirm parking structure concrete requirements before downstream trades mobilize.
Commercial & Industrial Applications
Typical applications
Execution framework
How we keep the scope on schedule
- 01
Scope coordination
We align drawings, RFIs, and finish standards with your team to confirm sequencing, logistics, and tolerances before parking garage construction mobilizes.
- 02
Site logistics & safety
Detailed logistics maps, crane placement, and safety planning keep crews productive and compliant throughout parking garage construction execution in Irving.
- 03
Field execution
Self-performed crews manage layout, formwork, placement, and finishing with superintendent oversight and real-time reporting.
- 04
Close-out & turnover
Punch walks, testing reports, and as-built documentation verify performance before handing off to downstream trades.
Quality and safety controls
Certified crews & audits
Weekly safety stand-downs, JHAs, and third-party inspections keep our parking garage construction teams compliant on every Irving, TX jobsite.
Testing & documentation
We coordinate break tests, flatness readings, and special inspections with labs to maintain traceable records for owners and parking garage contractorss.
Communication rhythm
Look-ahead schedules, coordination huddles, and daily reports ensure no surprises for the GC or owner reps.
Need project-specific QA/QC documentation, submittals, or safety plans? We assemble packages tailored to your owner and AHJ requirements before mobilization.
Measured outcomes
Results owners notice
Every parking garage construction package is tracked against schedule, QA benchmarks, and owner punch lists so you can move to the next trade with confidence.
- Schedule reliability
- 99% milestones met
- Owner punch items
- <2 per project
- Testing compliance
- 100% logs filed
- Crew retention
- 5+ year leads
Tracked through weekly look-aheads and daily updates to keep parking garage construction scopes synced with other trades in Irving.
Proactive walk-throughs and photo documentation keep finish quality tight and cut rework.
Cylinder breaks, floor flatness, and inspection reports uploaded within 24 hours of each pour.
Experienced foremen guide every parking garage construction phase, protecting craftsmanship and safety culture.
Frequently asked questions
Parking Garage Construction in Irving, TX
Common questions from developers and property owners planning parking garage construction projects across North Texas.
Do you build cast-in-place or precast parking structures?
We construct both cast-in-place and precast hybrid structures. Cast-in-place offers more flexibility for irregular sites and architectural requirements, while precast can accelerate schedules on suitable projects. We help owners evaluate the best approach for each situation.
How do you handle waterproofing in parking structures?
Parking deck waterproofing is critical to long-term performance. We install traffic-bearing membrane systems on elevated decks, provide proper slope for drainage, and ensure expansion joints are properly detailed. These systems protect the concrete from chloride intrusion and freeze-thaw damage.
What's the typical construction schedule for a parking garage?
Schedule depends on structure size and complexity. A typical 500-space, 4-level structure takes 10-14 months from start to occupancy. We develop detailed schedules during preconstruction and maintain weekly progress reporting throughout construction.
Do you handle MEP and site work for parking garages?
As your general contractor, we coordinate all trades including electrical for lighting, fire protection, elevator installation, and site work. Property owners have single-source accountability for the complete parking structure project.
Ready when you are
Get a direct bid for your parking garage construction project
Developers and property owners: share your plans and we'll provide a complete project proposal with transparent pricing and single-source accountability as your general contractor.