
Service profile
Structural Slabs on Grade
Laser-screeded structural slabs meeting FF/FL tolerances for warehouses, robotics facilities, and high-bay storage.
- Mobilization
- 5-7 days
- QA reporting
- Daily field logs
- Packages delivered
- 400+
- Crew coverage
- Irving & Metroplex
- Self-performed
- Core scope crews
- Average variance
- <1% schedule
About Structural Slabs on Grade
Structural slabs on grade form the working surface for warehouses, distribution centers, manufacturing facilities, and commercial buildings throughout the DFW Metroplex. These aren't residential garage slabs—they're precision-engineered concrete floors designed to carry heavy loads, support racking systems, and withstand years of forklift traffic.
As your general contractor for industrial and commercial slabs, we deliver floors that meet the flatness and levelness specifications your operations require. Modern warehousing and manufacturing demand FF/FL tolerances that standard construction practices can't achieve. Our crews use laser screeds, proper curing methods, and tight quality control to hit these specifications.
The explosive growth of e-commerce fulfillment and logistics in North Texas has driven demand for high-performance warehouse floors. These facilities typically specify superflat floors for narrow-aisle racking, requiring FF70/FL50 or better tolerances. Our crews have poured millions of square feet of high-tolerance slabs throughout the DFW logistics corridor.
Beyond flatness, industrial slabs require proper joint design, reinforcement strategy, and slab thickness to handle the loads your facility will see. We work with property owners and developers to engineer slabs that will perform for the life of the building, not just pass inspection at turnover.
What's Included
- Subgrade preparation and compaction
- Vapor barrier and base preparation
- Rebar or fiber reinforcement installation
- Precision concrete placement with laser screed
- Joint sawing and layout
- Curing compound or wet curing
- Floor flatness testing and documentation
- Densifier and sealer application
What this scope delivers
As your general contractor, we engineer, schedule, and execute structural slabs on grade packages across Irving, TXfor commercial and industrial projects. Property owners and developers get direct accountability, transparent pricing, and professional project management.
Design-assist alignment
We plug into preconstruction early, reviewing drawings for embed coordination, lift plans, and pour sequencing so structural slabs on grade aligns with the broader build.
Crewed for Metroplex speed
Dedicated slabs on grade crews staged across the Metroplex shorten mobilization windows and keep manpower consistent through multi-phase scopes.
Transparent field reporting
Daily industrial concrete floors updates, photo logs, and testing summaries document every milestone for owner reps and construction managers.
QA/QC baked into pours
Laser layout, third-party testing, and post-pour walks confirm warehouse slabs Irving requirements before downstream trades mobilize.
Commercial & Industrial Applications
Typical applications
Execution framework
How we keep the scope on schedule
- 01
Scope coordination
We align drawings, RFIs, and finish standards with your team to confirm sequencing, logistics, and tolerances before structural slabs on grade mobilizes.
- 02
Site logistics & safety
Detailed logistics maps, crane placement, and safety planning keep crews productive and compliant throughout structural slabs on grade execution in Irving.
- 03
Field execution
Self-performed crews manage layout, formwork, placement, and finishing with superintendent oversight and real-time reporting.
- 04
Close-out & turnover
Punch walks, testing reports, and as-built documentation verify performance before handing off to downstream trades.
Quality and safety controls
Certified crews & audits
Weekly safety stand-downs, JHAs, and third-party inspections keep our structural slabs on grade teams compliant on every Irving, TX jobsite.
Testing & documentation
We coordinate break tests, flatness readings, and special inspections with labs to maintain traceable records for owners and slabs on grades.
Communication rhythm
Look-ahead schedules, coordination huddles, and daily reports ensure no surprises for the GC or owner reps.
Need project-specific QA/QC documentation, submittals, or safety plans? We assemble packages tailored to your owner and AHJ requirements before mobilization.
Measured outcomes
Results owners notice
Every structural slabs on grade package is tracked against schedule, QA benchmarks, and owner punch lists so you can move to the next trade with confidence.
- Schedule reliability
- 99% milestones met
- Owner punch items
- <2 per project
- Testing compliance
- 100% logs filed
- Crew retention
- 5+ year leads
Tracked through weekly look-aheads and daily updates to keep structural slabs on grade scopes synced with other trades in Irving.
Proactive walk-throughs and photo documentation keep finish quality tight and cut rework.
Cylinder breaks, floor flatness, and inspection reports uploaded within 24 hours of each pour.
Experienced foremen guide every structural slabs on grade phase, protecting craftsmanship and safety culture.
Frequently asked questions
Structural Slabs on Grade in Irving, TX
Common questions from developers and property owners planning structural slabs on grade projects across North Texas.
What FF/FL tolerances can you achieve?
We regularly pour slabs to FF50/FL30 for conventional warehouse floors and FF70/FL50 or better for superflat applications supporting VNA racking. The tolerance requirement depends on your racking system and forklift equipment—we work with your operations team to specify appropriate tolerances.
How do you achieve high flatness tolerances?
High-tolerance floors require laser screed equipment, proper concrete mix design, controlled placement rates, and immediate finishing. We also manage pour sequencing to minimize joints in traffic areas and use appropriate joint types for your floor loading.
What slab thicknesses are typical for warehouse floors?
Industrial warehouse slabs typically range from 6 to 8 inches depending on loads, with thickened areas at dock locations and under heavy equipment. We engineer slab thickness based on your specific loads rather than defaulting to standard specifications.
Do you handle slab curing and sealing?
Yes, proper curing is critical to slab performance. We apply curing compounds or wet cure as specified, and can provide densifier and sealer applications for enhanced durability and dust resistance. These steps are included in our turnkey floor packages.
Ready when you are
Get a direct bid for your structural slabs on grade project
Developers and property owners: share your plans and we'll provide a complete project proposal with transparent pricing and single-source accountability as your general contractor.