Concrete Contractors of Irving Logo
Logistics Yard Hardstands commercial concrete contractors

Service profile

Logistics Yard Hardstands

High-load hardstands and trailer storage pads engineered for intermodal and logistics operations.

Mobilization
5-7 days
QA reporting
Daily field logs
Packages delivered
400+
Crew coverage
Irving & Metroplex
Self-performed
Core scope crews
Average variance
<1% schedule

About Logistics Yard Hardstands

Logistics yard hardstands and heavy-duty paving support the warehousing and distribution operations driving North Texas economic growth. Trailer storage areas, truck yards, intermodal container handling zones—these concrete surfaces must withstand heavy loads, intensive use, and the efficiency demands of modern logistics.

As your general contractor for logistics concrete, we deliver yard hardstands engineered for the specific loads these operations generate. Loaded trailers create heavy point loads; container handling equipment imposes dynamic forces; truck maneuvering demands robust concrete edges and joints resistant to chipping and spalling.

The DFW logistics corridor—particularly around DFW Airport, along I-20, and near intermodal facilities—generates massive demand for heavy-duty yard paving. Distribution centers for major retailers, third-party logistics providers, and e-commerce fulfillment operations all require extensive concrete hardstands as critical operational infrastructure.

Logistics concrete differs from standard parking lots—thicker sections (typically 8-10 inches), heavy-duty reinforcement, tight joint spacing, and often specialized joint designs to handle loaded trailer legs without edge failure. We engineer and construct these systems based on proven logistics industry standards.

What's Included

  • Heavy-duty subgrade preparation
  • Thick reinforced concrete sections
  • Trailer-resistant joint systems
  • Drainage integration
  • Truck turning radius design
  • Loading dock apron integration
  • Striping for traffic control
  • Phasing for operational facilities

What this scope delivers

As your general contractor, we engineer, schedule, and execute logistics yard hardstands packages across Irving, TXfor commercial and industrial projects. Property owners and developers get direct accountability, transparent pricing, and professional project management.

Design-assist alignment

We plug into preconstruction early, reviewing drawings for embed coordination, lift plans, and pour sequencing so logistics yard hardstands aligns with the broader build.

Crewed for Metroplex speed

Dedicated logistics yard concrete crews staged across the Metroplex shorten mobilization windows and keep manpower consistent through multi-phase scopes.

Transparent field reporting

Daily trailer storage pads updates, photo logs, and testing summaries document every milestone for owner reps and construction managers.

QA/QC baked into pours

Laser layout, third-party testing, and post-pour walks confirm hardstand paving requirements before downstream trades mobilize.

Commercial & Industrial Applications

Typical applications

Request a bid →
Distribution center trailer yardsContainer storage and handling areasLogistics facility expansionsIntermodal yard pavingHeavy equipment storage yardsThird-party logistics facility paving

Execution framework

How we keep the scope on schedule

  1. 01

    Scope coordination

    We align drawings, RFIs, and finish standards with your team to confirm sequencing, logistics, and tolerances before logistics yard hardstands mobilizes.

  2. 02

    Site logistics & safety

    Detailed logistics maps, crane placement, and safety planning keep crews productive and compliant throughout logistics yard hardstands execution in Irving.

  3. 03

    Field execution

    Self-performed crews manage layout, formwork, placement, and finishing with superintendent oversight and real-time reporting.

  4. 04

    Close-out & turnover

    Punch walks, testing reports, and as-built documentation verify performance before handing off to downstream trades.

Quality and safety controls

  • Certified crews & audits

    Weekly safety stand-downs, JHAs, and third-party inspections keep our logistics yard hardstands teams compliant on every Irving, TX jobsite.

  • Testing & documentation

    We coordinate break tests, flatness readings, and special inspections with labs to maintain traceable records for owners and logistics yard concretes.

  • Communication rhythm

    Look-ahead schedules, coordination huddles, and daily reports ensure no surprises for the GC or owner reps.

Need project-specific QA/QC documentation, submittals, or safety plans? We assemble packages tailored to your owner and AHJ requirements before mobilization.

Measured outcomes

Results owners notice

Every logistics yard hardstands package is tracked against schedule, QA benchmarks, and owner punch lists so you can move to the next trade with confidence.

Schedule reliability
99% milestones met

Tracked through weekly look-aheads and daily updates to keep logistics yard hardstands scopes synced with other trades in Irving.

Owner punch items
<2 per project

Proactive walk-throughs and photo documentation keep finish quality tight and cut rework.

Testing compliance
100% logs filed

Cylinder breaks, floor flatness, and inspection reports uploaded within 24 hours of each pour.

Crew retention
5+ year leads

Experienced foremen guide every logistics yard hardstands phase, protecting craftsmanship and safety culture.

Frequently asked questions

Logistics Yard Hardstands in Irving, TX

Common questions from developers and property owners planning logistics yard hardstands projects across North Texas.

What makes logistics yard concrete different from parking lots?

Logistics yards support heavier loads (loaded trailers, container handling equipment), experience more intensive use, and require thicker concrete sections, enhanced reinforcement, and specialized joints resistant to edge loading from trailer jacks.

How thick should trailer yard concrete be?

Trailer storage and container yards typically require 8-10 inch concrete sections with #4 or #5 rebar reinforcement. Exact thickness depends on subgrade conditions, equipment loads, and operational use patterns.

Can you phase logistics concrete around operational facilities?

Yes, most logistics yard expansions occur at operational distribution centers. We phase paving to maintain truck access and trailer storage capacity, working in sections that allow continuous facility operation during construction.

What about drainage for large logistics yards?

Drainage is critical for heavy-duty yards—standing water damages concrete and creates operational hazards. We integrate area drains, provide proper slopes, and design systems that keep large paved areas well-drained despite Texas rainfall.

Ready when you are

Get a direct bid for your logistics yard hardstands project

Developers and property owners: share your plans and we'll provide a complete project proposal with transparent pricing and single-source accountability as your general contractor.

Let’s pour

Ready to start your next commercial concrete project?

Call NowLogistics Yard Hardstands | Concrete Contractors of Irving | Concrete Contractors of Irving