
Service profile
Parking Lot Striping
Thermoplastic and paint striping, ADA layouts, and traffic signage installed alongside new concrete paving.
- Mobilization
- 5-7 days
- QA reporting
- Daily field logs
- Packages delivered
- 400+
- Crew coverage
- Irving & Metroplex
- Self-performed
- parking lot striping crews
- Average variance
- <1% schedule
About Parking Lot Striping
Parking lot striping, ADA markings, and traffic control signage complete the parking lot construction packages we deliver across the DFW Metroplex. Professional striping ensures safe traffic flow, maximizes parking capacity, and maintains ADA compliance for commercial and industrial facilities.
As your general contractor for complete parking lot packages, we integrate striping with our concrete paving work—ensuring new lots are fully functional and compliant from day one. This turnkey approach prevents delays waiting for separate striping contractors and provides unified warranty for complete parking facilities.
Modern parking lot striping uses thermoplastic for durability in high-traffic areas and paint for general markings. We match materials to traffic volumes, owner maintenance budgets, and expected service life. Thermoplastic markings last 3-5 years compared to annual repainting for standard traffic paint.
ADA compliance requires specific striping layouts, detectable warning surfaces, and signage for accessible parking. Our crews understand these requirements and execute compliant layouts that meet federal and Texas standards while working efficiently with your site design.
What's Included
- Layout and design verification
- Surface cleaning and preparation
- Thermoplastic application
- Traffic paint striping
- ADA-compliant markings
- Signage installation
- Detectable warning surfaces
- Final inspection
What this scope delivers
As your general contractor, we engineer, schedule, and execute parking lot striping packages across Irving, TXfor commercial and industrial projects. Property owners and developers get direct accountability, transparent pricing, and professional project management.
Design-assist alignment
We plug into preconstruction early, reviewing drawings for embed coordination, lift plans, and pour sequencing so parking lot striping aligns with the broader build.
Crewed for Metroplex speed
Dedicated parking lot striping crews staged across the Metroplex shorten mobilization windows and keep manpower consistent through multi-phase scopes.
Transparent field reporting
Daily ada striping updates, photo logs, and testing summaries document every milestone for owner reps and construction managers.
QA/QC baked into pours
Laser layout, third-party testing, and post-pour walks confirm parking lot markings requirements before downstream trades mobilize.
Commercial & Industrial Applications
Typical applications
Execution framework
How we keep the scope on schedule
- 01
Scope coordination
We align drawings, RFIs, and finish standards with your team to confirm sequencing, logistics, and tolerances before parking lot striping mobilizes.
- 02
Site logistics & safety
Detailed logistics maps, crane placement, and safety planning keep crews productive and compliant throughout parking lot striping execution in Irving.
- 03
Field execution
Self-performed crews manage layout, formwork, placement, and finishing with superintendent oversight and real-time reporting.
- 04
Close-out & turnover
Punch walks, testing reports, and as-built documentation verify performance before handing off to downstream trades.
Quality and safety controls
Certified crews & audits
Weekly safety stand-downs, JHAs, and third-party inspections keep our parking lot striping teams compliant on every Irving, TX jobsite.
Testing & documentation
We coordinate break tests, flatness readings, and special inspections with labs to maintain traceable records for owners and parking lot stripings.
Communication rhythm
Look-ahead schedules, coordination huddles, and daily reports ensure no surprises for the GC or owner reps.
Need project-specific QA/QC documentation, submittals, or safety plans? We assemble packages tailored to your owner and AHJ requirements before mobilization.
Measured outcomes
Results owners notice
Every parking lot striping package is tracked against schedule, QA benchmarks, and owner punch lists so you can move to the next trade with confidence.
- Schedule reliability
- 99% milestones met
- Owner punch items
- <2 per project
- Testing compliance
- 100% logs filed
- Crew retention
- 5+ year leads
Tracked through weekly look-aheads and daily updates to keep parking lot striping scopes synced with other trades in Irving.
Proactive walk-throughs and photo documentation keep finish quality tight and cut rework.
Cylinder breaks, floor flatness, and inspection reports uploaded within 24 hours of each pour.
Experienced foremen guide every parking lot striping phase, protecting craftsmanship and safety culture.
Frequently asked questions
Parking Lot Striping in Irving, TX
Common questions from developers and property owners planning parking lot striping projects across North Texas.
When should thermoplastic be used versus paint?
Thermoplastic provides superior durability for high-traffic areas, crosswalks, and stop bars. Standard traffic paint works well for stall lines and directional arrows in lower-traffic areas. We help owners balance durability and cost.
How soon after concrete paving can striping occur?
Concrete must cure adequately for paint adhesion—typically 28 days for optimal bonding, though faster schedules are possible with proper surface preparation and sealer application. We coordinate striping timing with project schedules.
What about ADA-compliant striping layouts?
ADA requires specific accessible space dimensions, van-accessible spaces, signage, and detectable warning surfaces. We design and install compliant layouts meeting federal and local accessibility requirements.
Can you re-stripe existing parking lots?
Yes, we provide restriping for existing lots including removal of old markings, layout verification, and fresh striping application. This service extends to lots we didn't originally construct.
Ready when you are
Get a direct bid for your parking lot striping project
Developers and property owners: share your plans and we'll provide a complete project proposal with transparent pricing and single-source accountability as your general contractor.